January 15, 2026 Chungju Daehwa Mine Project Progress
페이지 정보

본문
To prevent relatively small aggregates from scattering during blasting operations, the entrance door made of waste tires at the existing south adit was removed. The area was covered prior to blasting, and blasting was conducted with additional precautions to prevent possible safety accidents. This work not only enhanced safety but also significantly reduced noise generated during blasting.