February 11, 2026 Chungju Daehwa Mine Project Progress
페이지 정보

본문
A separate support frame for the dust collector of the completed Ball Mill was fabricated, followed by painting work. In addition, to remove rocks with visible residual cracks on the ceiling after drilling and blasting during the new surface adit excavation, the digging bucket head of the excavator was removed.
Meanwhile, excavation of the new surface
adit is proceeding smoothly with the mobilization of a hydraulic drill,
excavator, and payloader.

