August 19, 2025 Chungju Daehwa Mine – Project Progress Update
페이지 정보

본문
Formwork was removed from three previously cast concrete foundation areas, including:
1. Aggregate discharge facility pad
2. Processing plant water tank foundation
3. Waste-rock stockpile groundwater well pad
The water tank at the crusher loading area
will be uprighted and connected shortly.
To prevent winter freezing, the well pad was reinforced using a concrete
enclosure and an additional protective steel container.
A vibrating feeder for the aggregate line has been installed on the prepared concrete pad, and overhaul inspections have commenced