April 8, 2025 Chungju Daehwa Mine – Project Progress Update
페이지 정보

본문
During the previous winter, severe freezing
caused the collapse of existing water pipelines, halting several construction
activities across the site.
The ongoing water pipeline installation aims to prevent future supply
interruptions during winter operations.
Since the waste-rock stockpile is located at the lowest elevation, the trenching work proceeds upward along the slope while laying pipes and cables. Due to safety concerns, construction is being carried out with heightened caution and step-by-step inspection.

