May 29, 2024 Chungju Daehwa Mine – Project Progress Update
페이지 정보

본문
The licensed processing and waste-rock site includes slopes of approximately 16 degrees. To prevent soil collapse and slope erosion, slope stabilization works have been performed simultaneously with civil construction.
Due to the terrain, a large terrace structure is being constructed above the lower ground level. The processing plant will be built on this engineered terrace once completed.

