April 10, 2025 Chungju Daehwa Mine – Project Progress Update

페이지 정보

profile_image
작성자 최고관리자
댓글 0건 조회 29회 작성일 25-10-28 09:40

본문


Installation of underground water and electrical conduits from the lower to upper site areas has reached completion.
The main water tank located behind the cafeteria serves as the central distribution point, supplying water to each facility through connected pipelines.

Each water tank is equipped with valve connections, and the main tank features a water-level sensor integrated via the installed electrical conduit to control the operation of the submersible pump within the groundwater well.