Korea Molybdenum

Bulletin Board

Korea Molybdenum

May 29, 2024 Chungju Daehwa Mine – Project Progress Update

페이지 정보

profile_image
작성자 최고관리자
댓글 0건 조회 25회 작성일 25-10-27 18:08

본문


The licensed processing and waste-rock site includes slopes of approximately 16 degrees. To prevent soil collapse and slope erosion, slope stabilization works have been performed simultaneously with civil construction.

Due to the terrain, a large terrace structure is being constructed above the lower ground level. The processing plant will be built on this engineered terrace once completed.