After processing by the primary jaw crusher and vibrating feeder, aggregate enters the primary cone crusher before transferring to a secondary vibrating feeder.

Inspection and preparation of the screen deck installed above the secondary feeder have been completed.
A belt conveyor connection was installed to transport 100mm aggregates from primary screening to staging stockpiles for downstream processing.